Introduction

The Erbend MFC-MFB-MFD series includes motorized folding machines that require precise installation and commissioning. This manual outlines the steps for machine setup, calibration, and safety compliance.

Machine Layout

  • Ensure the installation surface is level and free of cracks.
  • Maintain at least 1 meter of clearance around the machine.
  • Refer to the user manual for exact machine dimensions and weight considerations.

Electrical and Air Connections

  • Connect the machine to the required voltage as specified on the machine type label.
  • Verify phase-phase, phase-neutral, and ground voltages before powering the machine.
  • Use the designated air connection ports for pneumatic components.

Light Barriers

  • Proper alignment of light barriers is required before body sheet installation.
  • Turn on the main power switch before adjusting barrier alignment.
  • If the receiver and transmitter do not align, the machine will generate an error.

Foot Pedal and Backgauge Consoles

  • The foot pedal operates in a plug-and-play configuration.
  • Additional backgauge consoles must be installed correctly for proper machine function.
  • Backgauge calibration is required after installation.

Leveling and Fixing

  • Use precision leveling tools to ensure correct positioning.
  • Secure the machine using anchoring bolts once leveling is completed.
  • Verify that all adjustments are correct before commissioning.

Sheet Support Adjustments

  • Adjust support tables to align with the lower tool.
  • Fine-tune the guide plates for consistent material feeding.
  • Secure all adjustments to maintain long-term accuracy.